System Integrating HOME > System Integrating > System Integrating
Contact Date Ordering Party Planning & Construction  
2011.09 KBS Delivery of the digital interfaced modular & midsize OB van,(SNG) System for KBS
2011.08 KBS Delivery of small OB van System for local KBS
2011.07 KBS Design & Installation of HB System for IAAF World Championships Daegu 2011
2011.07 KBS N Design & Installation of HDTV C subcontrol room for KBS N
2011.07 KBS Design & Installation of HD Digital System for Changwon
2011.01 KBS N Design & Installation of HD TV program for KBS N
2010.12 KBS Design & Installation of TV digital distribution
2009.09 KBS Design & Installation of Chuncheon system
2009.05 The Foreign Ministry Design & Installation of Korea-Asian special conference
2009.04 KBS Design & Installation of Daegu international marathon broadcasting
2008.11 KBS sign & Installation of KBS Radio CMPS
2008.08 KBS sign & Installation of Beijing Olympic IBC Center
2008.07 KTV Design & Installation of HDTV OB-VAN On-air System
2007.11 KTV Design & Installation of KTV System
2007.09 KBS Design & installation of HD 1TV
2007.08 KBS Design & Installation of Daejeon TV main system
2007.01 MBN Design & installation of the OB Van
2006.11 MBC Design & installation of the Radio AMU system
2006.11 PBC Design & installation of the Digital Dubbing room system
2006.10 KBS Design & installation of the 2 nd NPS system
2006.09 KBS Design & installation of the HD production system for KBS Daejeon
2006.09 KBS Design & installation of the 87th National Athletic Meet
2006.08 KBS Design & installation of 1TV Main control room
2006.07 PBC Design & installation of the 2 nd TV OB Van for PBC
2006.05 MBC Design & Contract for Aspect Ratio Converter
2005.11 KBS Design & installation of the Outbuiding for TS-C Monitor System
2005.11 KBS Design & installation for TS-21,24 System renovation
2005.09 Myungsung church Design & installation of the Optic-transmission equipment
2005.08 DI-link Inc. Design & installation of the OB Van
2005.08 SK C&C Inc. Design & installation of the Network Production for KBS
2005.02 PBC Design & installation of the Digital Broadcasting B studio
2005.01 PBC Design & installation of the 1 st TV OB Van
2004.12 KBS sign & installation of the Digital Distribution system
2004.09 Onuri Church Design & installation of the Transmission Room Moving
2004.07 MBC. KBS Design & lease contract for Athens Olympic
2004.06 PBC Design & installation of the Digital Main Control Room system
2003.12 Road Traffic Safety Authority Design & installation of the Digial TBN System
2003.10 MBC Design & lease contract for Jeju Peace Festival IBC System
2003.09 MBC. KBS sign & lease contract for 2003 Dae-gu Universiad Game IBC system
2003.06 KBS Design & installation of the Digital for TS-D
2003.05 Seoul Olympic Sports Promotion Foundation Design & contract for the Back-up system
2002.08 MBC. KBS Design & installation for the 2002 Busan Asian Game System
2002.02 SKY-KBS Design & installation of the Digital OB Van for SKY-KBS (16 ton , 5 ton )
2002.01 SKY-KBS Design & contract for KBS Satellite system
2001.11 KBS Design & lease contract for Saltlake Winter Olympic For KBS
2001.11 MBC Design & lease contract for Saltlake Winter Olympic For MBC
2001.08 SKY-KBS Design & installation of the electricity,signal & lighting system
2001.08 MBC Design & installation of the Main, Sub-Room & Main Radio system for Cheongju MBC
2001.07 Powercomm Inc. Design & installation for the broadcast signal observation
2001.03 MBC Media-teck Inc. Design & installation for MBC Satellite broadcast system
2001.11 OCA Design & installation for Busan OCA Meeting
2000.10 Coex Inc. Design & installation for the 3rd ASEM (Asia Europe Meeting)
2000.06 Government Information Agency Design & installation of North & South President Meeting broadcast system
2000.05 KBS Design & installation for 2000 Sydney Olympic
2000.05 MBC Design & installation of the OB Van
2000.04 MBC Design & installation of the Digital Main Control Room for Busan MBC